SIGNIFICANT REFERENCES

Energy production applications

 

1.      Revitalization of electro-portal crane type: EPD-160/50t-15m-UK-RV HPP Šerdap 1.

Detailed design, control algorithm, supervision and built design 160t/50t. Drives with frequency converters, PLC control. Single and tandem operation. Wireless communication between cranes. Contractor Company „PRO TENT” d.o.o., Obrenovac and Mikro Kontrol Beograd, 2013 and 2014.

2.      Revitalization of electroportal crane type: EPD-160/50t-15m-UK-RV HPP Šerdap 1.

The main project of the electrical part of crane EPD-160/50t-15m-UK-RV. Drives with frequency converters, PLC control. Single and tandem operation. Wireless communication between cranes. Contractor Faculty of Electrical Engineering, Belgrade, 2009.

3.      Techno-economical analyses of application of controlled electrical drives with induction motors fed from frequency converters  for mills of block A4 in Thermal Power Plants „Nikola Tesla”-A,

Analyses of replacement of existing drives with mechanical variators on six mills, with controlled drives with induction motors fed from frequency converters. Completed for the PE Thermal Power Plants „Nikola Tesla”-A, Faculty of Electrical Engineering, University of Belgrade, 2007.

4.      Selection and attraction of the strategic partner for TPP Kolubara B construction completion and construction of the new block of Steam Power Plant Nikola Tesla - TENT B3.

Consulting activities for the PE „Electric power industry of Serbia” into the framework of the project  „Improvement of organizational, financial and investment performance of Electric power industry of Serbia - Section 2”, 2006-2007.

5.      New drives and control system of the two cranes in the Hydro Power Plant Šerdap, Kladovo.

Project, supervision and commissioning in 2004. 400t/80t/10t. The drive with frequency converters, PLC control. Separate and tandem operation of cranes. Wireless communication between cranes. Photos.

6.      New drives and control system of the two cranes in the Hydro Power Plant High Dam Aswan, Egypt

Project, supervision and commissioning in 2004. 400t/32t/3.2t. The drive with frequency converters, PLC control. Separate and tandem operation of cranes. Wireless communication between cranes. Photos.

7.      „Validation study of frequency converters incorporation into dozer and coal delivery drive in Thermal Power Plants „Nikola Tesla”,

Completed for the PE „Thermal Power Plants „Nikola Tesla”, Thermal Power Plant „B”, Belgrade, 2003.